大源渡电航工程泄水闸低堰闸墩预应力锚索施工

Construction of Pre-stressed Anchor Cable for Low Barrage Pier of Release Sluice at Dayuandu Hydropower Project on the Xiangjiang River
下载PDF
导出
摘要 大源渡泄水闸低堰闸墩设计采用 4 80 0 k N预应力锚索来改变牛腿内和牛腿前方闸墩的应力状态 。 In design of low barrage pier of release sluice at Dayuandu hydropower project , 4800 kN pre stressed anchor cable is used to change stress state in bracket and before bracket . According to construction conditions , construction technique of pre stressed anchor cable in pier and some problems for attention in construction are presented.
出处 《四川水力发电》 2000年第3期28-31,65,共5页 Sichuan Hydropower
关键词 大源渡工程 闸墩 预应力锚索 泄水闸 Dayuandu project pier pre stressed anchor cable