摘要
研究堆石坝施工中的料物调配问题 ,包括模拟模型建立、匹配矩阵与进度计划的描述、模拟过程与结果修正等内容 ,提出了一种用于解决大坝施工中料物调配问题的新方法 .
The material programming process in rockfill dam construction, including establishment of simulation model, matching matrix, system simulation and its application, etc., are described. And some new methods for material programming in rockfill dams' construction are proposed also.
出处
《武汉水利电力大学学报》
EI
CSCD
2000年第5期16-18,共3页
Engineering Journal of Wuhan University
关键词
堆石坝
施工
料物调配
rockfill dam
construction
material programming