摘要
综述已有碾压混凝土大坝应变计组的埋设方法 ,通过棉花滩工程的现场施工埋设 ,对应变计组的埋设方法作进一步的研究。
This paper summarizes the contemporary embedment methods of strainometers in roller compacted concrete dams. Through the embedment of instruments in Mianhuatan hydroelectric project, further study is made on the embedment of strainometers.
出处
《大坝观测与土工测试》
2000年第5期37-39,共3页
Dam Observation and Geotechnical Tests