摘要 对洪家渡水电站引水系统在设置尾水调压室和取消尾水调压室两种情况下的过渡过程进行了计算研究 .计算表明 ,通过考虑机组特性、优化机组导叶关闭规律及合理整定调速器参数 ,该水电站取消尾水调压室的方案是可行的 ,其各设计参数控制值基本上能满足设计要求 . This paper presents the main results of the research on the transition process of the diversion system at the Hongjiadu hydropower station in the presence or absence of the tailwater surge chamber. The results show that it is feasible to remove the tailwater surge chamber at the station in consideration of the optimized closing of the guide blades and the properties of the units. The governing values of parameters can basically satisfy the requirement for design. The present achievements have been used as one of the important bases for comparision of alternatives of the station.
出处 《河海大学学报(自然科学版)》 CAS CSCD 2000年第2期96-100,共5页 Journal of Hohai University(Natural Sciences)
关键词 调压室 过渡过程 水电站 引水系统 设计方案 surge chamber transition process closing of guide blades rising ratio of rotational speed inside water pressure
  • 相关文献

参考文献1

  • 1刘启钊,水电站调压室,1995年,1页

同被引文献54

引证文献7

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部