摘要
在一起立式水管锅炉爆炸事故分析中,由于现场损坏严重,安全附件和记录均已经严重破损,不能够有效提供锅炉爆炸前运行参数。基于安全评价理论中的物理爆炸模型,通过现场飞出碎片的测量,对该锅炉爆炸前的能量和运行压力进行了估算。该估算结果与其他方法进行评估的结果相一致,为事故分析提供了重要参考依据。
In a certain vertical water tube boiler explosion analysis, all the safety accessories and records have been damaged and no data related with before explosion could be found. Based on the physical explosion model in safety evaluation, the boiler energy and operation pressure before explosion was estimated by the measurement of flying debris. The estimated results which were consisted with the results of other methods provided important reference basis for the accident analysis.
出处
《中国安全生产科学技术》
CAS
CSCD
2013年第4期87-90,共4页
Journal of Safety Science and Technology
关键词
物理爆炸模型
锅炉爆炸
压力
physical explosion model
boiler explosion
pressure