结合亭子口水利枢纽工程500 kV变压器布置设计,采用人工卸车、内检引线规定"全等效露空时间"、变频法长时感应电压试验等措施,确保了变压器安装技术满足工程需要,可供同类工程参考。
Combining with the layout design of 500 kV transformers in Tingzikou Water Control Project, the artificial unloading, the "Full Equivalent In-air Time" for inner checking and the induced voltage tests with frequency conversion are used in the installation of transformers. These installation technologies ensure that the transformer installation meets the requirements of engineering, and can be as reference to similar projects.