摘要
结合厦深铁路轨道工程施工,就18#高速有砟道岔的施工方法进行了论述,总结出了包括18#道岔的粗调、铝热焊、精调等方面的施工经验和质量控制措施。
This article,based on the construction of Xiamen-Shenzhen highspeed railroad,expounds the construction methods of 18 # ballast railroad switch and summarizes the construction experience and quality controling measures including the coarse adjustment,thermite welding and the accurate adjustment of 18# railroad switch.
出处
《物流工程与管理》
2013年第4期88-90,137,共4页
Logistics Engineering and Management
关键词
高速铁路
18#有砟道岔
施工
highspeed railway
18# ballast railroad switch
construction