摘要
分析了白水峪水电厂原计算机监控系统升级改造的原因,简述了监控系统升级改造的原则和改造后系统结构。改造后的系统投运以来,大大提高了监控系统的安全性和可靠性,最大程度地保证了电站的安全、高效运行。
The reasons and principles for upgrading and transforming original computer monitoring system of Baishuiyu Hydropower Plant are analyzed and upgraded system structure is illustrated. The upgraded system has greatly improved the safety and reliability of monitor system and ensure maximum security and efficient operation of the power plant.
出处
《水电与新能源》
2013年第3期35-36,44,共3页
Hydropower and New Energy
关键词
水力发电厂
计算机监控系统
升级改造
Hydropower Plant
computer monitor system
upgrading and transformation