期刊文献+

东方广场工程综合施工技术

COMPREHENSIVE CONSTRUCTION TECHNOLOGY OF ORIENTAL PLAZA
下载PDF
导出
摘要 北京东方广场工程总建筑面积94万m2 ,为亚洲最大的商业房地产建筑群。针对该工程面积大、设计变化多、管理难度大、场地狭小、工期紧等特点 ,采用了抽渗结合降水、基坑周边机械钻孔桩支护、UEA补偿收缩混凝土、预应力混凝土、新型模架体系等先进技术 。 Beijing Oriental Plaza project is the largest property development of multi-buildings in Asia, with total space of 940 000 m2. Considering difficulty factors such as larger space, more change order,difficult management,narrow construction site and urgent program,comprehensive construction technology was adopted such as dewatering by pumping and leaching,slope protection through machine pilling,concrete mixed with UEA expansion additive,prestressed concrete,new type of form scaffolding system etc.Finally a quality project was effectively completed.
作者 徐湘生
机构地区 北京建工集团
出处 《建筑技术》 北大核心 2000年第11期736-741,共6页 Architecture Technology
关键词 建筑群 底板 降水 商业建筑 支护 混凝土 模架 project with multi-buildings base plate dewatering slope protection concrete form scaffolding
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部