摘要
本文以华电国际莱城发电厂磨煤机一次风关断闸板门行程控制装置改进为例,详细分析了一次风关断闸板门行程控制装置现状、改进思路、具体改进过程和应用情况,可供同类设备改进做参考。
This paper taking mill primary air shutoff gate travel control device improvement of Huadian International Laicheng power plants as an example,a detailed analysis of primary air shutoff gate travel control device status,improvement ideas,the concrete improvement process and application,which can be a reference for similar equipment improvement for reference.
出处
《山东电力高等专科学校学报》
2013年第2期49-51,共3页
Journal of Shandong Electric Power College