期刊文献+

两水平井“点对点”精确中靶对接施工技术 被引量:8

Accurate "Point to Point" Target Butting of Two Horizontal Wells
下载PDF
导出
摘要 自煤层气水平对接井领域引入美国Vector公司生产的RMRS旋转磁测距系统以来,我国煤层气和水溶开采领域的定向对接井的施工技术取得了重大突破。然而,大多数应用仍局限于传统的U形井组,属于由一个垂直井和一个水平井组成的井组。而华晋焦煤柳林煤层气项目DS井组是由2个水平井组成的煤层气井组,采用国产"慧磁"钻井中靶引导系统使2井实现"点对点"对接。重点介绍了"点对点"精确中靶作业施工技术方法。 Since the Rotary magnetic ranging system (RMRS) of America Vector Co. is introduced in CBM horizontal but- ted wells field, major breakthrough was made in the construction technology of directional butted wells both in CBM and so- lution mining industries in China. However, most application is still limited in U-shaped well group composed of a vertical well and a horizontal well. In a project of Huajin eoking coal Co. , DS well group is a coal-bed methane well group com- posed of 2 horizontal wells, by the target guidance system "Huici" which is made in China, "point to point" is realized. The paper introduced the technical methods of accurate "point to point" target construction.
出处 《探矿工程(岩土钻掘工程)》 2013年第5期4-7,共4页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 定向对接井 点对线 点对点 “慧磁”钻井中靶引导系统 煤层气井 directional butted wells point to point "Huici" target guidance system CBM well
  • 相关文献

参考文献5

二级参考文献20

共引文献59

同被引文献63

引证文献8

二级引证文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部