黑山湖特大桥跨兰新铁路零号块临时固结计算 被引量:1

Computation on Temporary Consolidation of Zero Number Block of Heishanhu Large Span Crossing LanXin Railway
下载PDF
导出
摘要 连续梁桥墩和梁存在支座,是铰接关系。而连续梁桥采用悬臂施工在没有合拢前是悬臂状态,为了保证挂篮施工过程的安全性,必须对连续梁桥墩和梁进行临时固结处理。因此临时固结成败直接关系着连续梁悬臂施工的安全和稳定。本文结合黑山湖跨兰新铁路立交特大桥,分析连续梁桥临时固结的设计计算。 There are supports between the continuous beam bridge piers and beams, which are articulated together.In order to ensure the security of the hanging basket construction process, it is necessary to solidify continuous beam bridge piers and beams. So temporary consolidation directly determines the success or failure of the continuous beam cantilever construction.Taking the overpass crossing Lanxin Railway in Heishanhu as a case study, this paper analyzes the computation of the bridges' temporary consolidation.
作者 杨勃 张鹏
出处 《晋城职业技术学院学报》 2013年第3期63-66,共4页 Journal of Jincheng Institute of Technology
关键词 连续梁 悬臂施工 临时固结 continuous beam cantilever construction temporary consolidation
  • 相关文献

参考文献2

  • 1中华人民共和国铁道部.客运专线铁路桥涵工程施工质量验收暂行标准[S].铁建设[2005]160号.
  • 2铁道部经济规划设计院.客运专线铁路桥涵工程施工技术指南,经规标准[S ].2005.

共引文献1

同被引文献1

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部