3[3]C.Hoga and P.Skare.IEC61850 Projects in Germany and Switzerland[C].2005/2006 IEEE PES Transmission and Distribution Conference and Exposition,May 14-21,2006.Dallas,UAS.
4[4]K.P.Brand,T.Maeda,K.Oestrich,P.Rietmann.First Experiences With Customer Specifications of IEC61850 Based Substation Automation Systems[C].Study Committee B5Colloquium,September 14-16,2005.Calgary,Canada.
5[5]Clemens Hoga,Gordon Wong.Utilities and Industries of today:Leading by Following IEC61850[C].15th Power Systems Computation Conference,August 22-26,2005.Liege,Belgium.
6[6]Christoph Brunner.IEC61850 Process Connection-a Smart Solution to Connect the Primary Equipment to the Substation Automation System[C].15th Power Systems Computation Conference,August 22-26,2005.Liege,Belgium.
7[7]K.P.Brand,M.Janssen.The Specification of IEC61850 Based Substation Automation Systems[C].DistribuTECH 2005Conference & Exposition,January 25-27,2005.San Diego,California.
8[8]I.de Mesmaeker,P.Rietmann,K.P.Brand,P.Reinhardt.Substation Automation based on IEC61850[C].Sixth Regional Conference for National Committees of CIGRE in Arab Countries on Arab Common Market for Electricity and Electrical Industries,November 21-23,2005.Cairo,Egypt.
9[9]Jian Zhou,Ling Cai,Hongwei Qi.Primary Application of User-promoted IEC61850 Standard[C].China International Conference On Electricity Distribution 2006,September 17-20,2006.Beijing China.
10[10]JianZhong Fan,LianShun Mu.Impact and Implementation Research of IEC61850 for Utilities[C].China International Conference On Electricity Distribution 2006,September 17-20,2006.Beijing China.