摘要
介绍了土工膜防渗体系在湖北水布垭水电站大坝面板挤压破坏临时处理工程中的应用,描述了水下铺设土工膜的施工工艺。
This paper introduces the application of geomembrane in temporary treatment of extrusion damage of face slab of Shuibuya hydropower dam. As well, the construction techniques in underwater laying of geomembrane were presented here, for reference.
出处
《大坝与安全》
2013年第2期48-51,共4页
Dam & Safety
关键词
土工膜
水下铺设
防渗体系
水布垭水电站
geomembrane
underwater laying
seepage control system
Shuibuya hydropower station