期刊文献+

居隆庵铀矿床竖井施工中需注意的安全技术问题 被引量:1

Some safety technology problems in shaft construction of Julong'an uranium deposit
下载PDF
导出
摘要 通过分析居隆庵铀矿床探矿取样竖井工程勘察钻孔揭露的地层岩性及构造裂隙等特征,探讨影响竖井施工的主要安全因素,提出施工过程中需注意的安全技术问题,对指导竖井施工具有重要意义。 Through the analysis of formation lithology,tectonic fissure and some other characteristics which were revealed by the exploration drilling in shaft of J ulong' an uranium deposit,the main safety factors affecting shaft construction are discussed, and the technology and safety issues needed to pay attention to in the process of construction are put forward, which has great guiding significance in shaft construction.
出处 《铀矿冶》 CAS 2013年第2期60-62,66,共4页 Uranium Mining and Metallurgy
关键词 铀矿床 竖井施工 安全技术 shaft construction safety technology problem
  • 相关文献

同被引文献6

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部