摘要 以安徽省某项跨区域电网送出工程为例,依据当前实际运行输送能力,采用现金流量法分析计算了该电网工程的动态投资回收期,测算结论作为省内今后类似的送出工程投资决策参考。 This paper measure and calculate the statement of cash flow of the grid ,and Analysis and calculate the payback times of Dynamic in- vestment about the grid project connecting Anhui and other areas for transmission power based on. giving a comprehensive overview about bowth the scale of construction and disposable investment of the grid project connecting Anhui and Huadong for transmission power, baseing on the actual transmissinn capacity . The result will he a Decision reference on the II period.
出处 《科技和产业》 2013年第5期60-62,109,共4页 Science Technology and Industry
关键词 送出工程 动态投资 回收期 the grid project connecting Anhui and other areas for transmission power dynamic investment payback times
  • 相关文献

参考文献3

  • 1安徽省政府.安徽省国民经济和社会十一五发展规划纲要[z].合肥,2006.
  • 2全国注册咨询工程师资格考试参考教材编写委员会.中国项目决策分析与评价(2012年版)[M].北京:中国计划出版社,2011.
  • 3安徽省电力生产简报[Z].20072011年.

同被引文献26

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部