摘要
随着我司承修的油船比例逐步提高,很多油船都涉及蒸气加热管的换新工程,比较典型的是今年2月底进厂的"赫克勒斯"轮。本文就关于该轮的蒸气加热管换新工程谈谈工艺策划和质量控制。
As the tanker ratio gradually improve by our shipyard to get repair, many of the tankers have the project for change new steam heating tube.In recent,typical case is the ship "MT HERUCLESM" by the end of February come to our shipyard.I'll introduce process planning and quality control about the project change new steam heating tube.
出处
《广东造船》
2013年第2期70-71,65,共3页
Guangdong shipbuilding
关键词
油船
蒸气加热管
工艺策划
质量控制
Tanker
Steam Heating Tube
Process Planing
Quality Control.