土贤庄水电站采用渠道旁侧布置型式,安装2台2000kW的竖井贯流式机组,1台800kW的轴伸贯流式小机组。技施设计时对装机方案、挡水建筑物和厂房布置等进行了优化,使结构形式和布置更为合理,减少了工程量,节约了工程投资,同时方便了施工和运行管理。
Tuxian village hydropower station adopts the channel side arrangement type,installs two sets of 2000kW shaft through flow turbine and one 800kW shaft extension tubular generator. The installation program,water retaining structure and plant layout was optimized in the technical construction design stage, it makes the structure and layout is more reasonable ,re- duces the volume of work, saves the project investment, and is convenient for construction and operation management.
出处
《水科学与工程技术》
2013年第2期62-64,共3页
Water Sciences and Engineering Technology
关键词
水电站
优化设计
布置型式
挡水建筑物
厂房
hydropower station
optimization design
arrangement type
water retaining structure
factory building