摘要
本文主要是通过工作中的实践经验,对矿山测量中的各类贯通进行总结,简单讲解了各类贯通几何要素的确定方法。使得井巷的贯通计算更简便快捷。
This paper is mainly through the work of practical experience, on Mine Surveying in all types of transfixion were summarized briefly, various through geometric elements determination method. The roadway run-through calculation more simple and quick.
出处
《煤矿现代化》
2013年第3期100-101,共2页
Coal Mine Modernization
关键词
矿山测量
井巷贯通
几何要素
贯通测量
Mine survey
roadway through
Geometric factor
Through Survey