摘要
对太原铁路枢纽新建西南环线工程向阳店梁场预制T梁的施工技术进行了论述,指出严格卡控施工工序,坚决执行控制标准,大力加强科学管理可有效控制工程质量,能确保梁场高效优质完成施工任务。
This paper discussed the construction technology of Xiangyangdian beam yard precast T beam of Taiyuan railway hub new southwest ring project, pointed out strictly control the construction process, resolutely implement control standards, energetically strengthen scientific man- agement could effectively control project quality, ensured the beam yard high quality completion of construction tasks.
出处
《山西建筑》
2013年第18期183-185,共3页
Shanxi Architecture
关键词
安装模板
绑扎钢筋
预应力
installation formwork
assembling reinforcement
pre-stress