5Kong Y J and Fukuda T. Modeling of the Network-Level Pavement Repair Management System using Dynamic Programming [ A ]. Proceedings for International Conference Pavement and Bridge Management Systems. MOC, P R China, Canadian International Develolanent Agency, Beijing,China, 1998, 17- 26.
6Fwa T F, Chan W T and Tan C Y. Optimal Progmnaning by Genetic Algorithms for Pavement Management [J]. Transportalion Research Record 1455, 1994, 31 -41.
7Fwa T F, Chan W T and Hoque K Z. Analysis of Pavement Management Activities Prong by Genetic Algorithms[ J ]. Transportation Research Record 1643, 1998 (a),1,~6.
8Fwa T F, Chan W T and Hoque K Z. Multiobjective Optimization for Pavement Maintenance Prognmaning [ J]. Journal of Transportation Engineering, 126 (5), 2000, 367 - 374.
9Asset Management Primer [R]. Office of Asset Management, FHWA, US DOT, 1999.
10Annual Report 2001 [R]. Office of Asset Management, FHWA, US DOT, 2001.
4Sadeghi, N. , Fayek, A. R. , and Pedrycz, W. "Fuzzy Monte Carlo Simulation and Risk Assessment in Construction. " Computer - Aided Civil and Infrastructure Engineering, 2010,25 ( 4 ) : 238 - 252.
5Williams, T. "The Contribution of Mathematical Modeling to the Practice of Project Management. " IMA Journal of Management Mathematics,2003,14 ( 1 ) :3 -30.