5Tones G,Roberts M. Optimized Production Technology[M].IFS Publication,1990.
6Hatchuel A. Towards a New Planning and Scheduling Approach for Multistage Production Systems[J].International Journal of Production Research,1997,(03):867-886.
7Claudio Garavelli. Performance analysis of a batch production system with limited flexibility[J].International Journal of Production Economics,2001,(29):69-72.
4[1]RONDEAU P J, LITTERAL L A. Evolution of manufacturing planning and control systems: From reorder point to enterprise resource planning[J].Production and Inventory Management Journal,2001,42(2): 1-7.
5[2]GOLHAR D Y, STAMM C L. The Just-in-time philosophy:a literature review [J]. International Journal of Production Research, 1991,29(4):657-676.
6[3]GOLDRATT E M. Computerized shop floor scheduling[J].International Journal of Production Research, 1988,26(3):443-55.
7[4]PTAK C A.MRP, MRPII, OPT, JIT, and CIM - succession,evolution, or necessary combination [J]. Production and Inventory Management Journal, 1991,32(2):7-11.
8[6]PLENERT G, BEST T D. MRP, JIT and OPT: What's"best"? [J]. Production and Inventory Management, 1986,27(2):22-29.
9[7]COOK D P. A simulation comparison of traditional, JIT, and TOC manufacturing system in a flow shop with bottlenecks[J]. Production and Inventory Management Journal, 1994(1-5):73-78.
10[8]TAYLORⅢ L J.A simulation study of WIP inventory drive systems and their effect on financial measurements[J] .Integrated Manufacturing Systems, 1999,10(5):306-315.