摘要
针对生产物流系统中的批处理特点,本文提炼出批处理机生产与产品成批配送的协调调度问题进行研究。目标函数为最小化总权重完成时间。首先基于计算复杂性理论,通过三划分问题的归约证明该问题是强NP难的。其次运用动态规划方法,分别对于工件加工顺序给定或生产分批给定的两种特殊情况提出多项式时间的最优算法。
For the features of batching in production-logistic system, this paper is expected to investigate coordinated batching schedule and batching delivery. The objective function here refers to minimizing aggregate weighting amount of completion time. It is proved that this problem is NP-hard. For the two special cases with a fixed job sequence and a given batching decision, the optimal algorithms are proposed by dynamic programming respective- ly.
出处
《沈阳理工大学学报》
CAS
2013年第3期66-69,90,共5页
Journal of Shenyang Ligong University
基金
国家自然科学基金资助(71101097)
辽宁省高等学校优秀人才支持计划资助(LJQ2012017)
关键词
批处理机
批运输
动态规划
复杂性
batching machine
batch delivery
dynamic programming
complexity