多项目并行施工进度控制技术 被引量:1

Progress Control Technology for Parallel Construction of Multiple Project
下载PDF
导出
摘要 介绍了平行工序排序的基本实施过程,并以大明宫遗址公园宫门宫墙工程为例,针对该工程工期紧、需要边设计边施工的特点,采用平行工序排序技术对其原始网络图进行优化,优化结果表明:在工程总工期少许推迟的情况下,各道宫墙施工的最迟必须开始时间均向后推迟,可为该工程的设计与施工的准备工作提供充足的时间,从而使得该工程边设计边施工的管理模式得以实现。 The basic implementation procedure of parallel processes sorting technology is introduced.Taking Daminggong National Heritage Park project as an example,considering that this project had a tight construction schedule,which required synchronization of the design and construction,the project network was optimized using the parallel processes sorting optimization technology.As a result of the optimization,the latest construction start time of all palace walls can be postponed with only minor delay to the overall construction period.This provides sufficient time for the project design and construction preparation and allows the fulfilment of the management mode with synchronized design and construction.
出处 《施工技术》 CAS 北大核心 2013年第10期100-104,共5页 Construction Technology
基金 住房和城乡建设部2012年科学技术项目计划--软科学研究项目(建设项目管理)(2012-R3-17)
关键词 项目管理 运筹学 平行工序 进度控制 project management operational research parallel processes progress control
  • 相关文献

参考文献8

二级参考文献43

共引文献32

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部