工程结算中现场签证风险的应对 被引量:8

Study on the Risk Response of Site Visa in Engineering Settlement
原文传递
导出
摘要 由于承发包双方在工程施工过程中,对现场签证重视不够;也由于双方利益的博弈,对项目建设中的矛盾存在不一致的处理方式,极易导致工程结算纠纷和现场签证风险。应通过完善法制建设,规范承发包双方在现场签证中的行为,加强双方互谅,调动其积极性,来达到风险控制的目的。 The risk of dispute comes from two major reasons. On one hand, the two parties of the contract don't attach great importance to site visa during the construction; on the other hand, considering their own benefits, each party of the contract uses different ways to deal with their disputes at different stage of the construction. In order to control all the risks, we should improve relevant laws and regulations, regulate the behaviors of employer and contractor in site visa, enhance the mutual understandings between the two parties of the contract and motivate the enthusiasm of good cooperation.
作者 吴冰 张星
出处 《建筑经济》 北大核心 2013年第6期58-59,共2页 Construction Economy
关键词 工程结算 现场签证 风险应对 engineering settlement site visa risk response
  • 相关文献

二级参考文献30

  • 1王晓州.建设项目委托代理关系的经济学分析及激励与约束机制设计[J].中国软科学,2004(6):77-82. 被引量:57
  • 2向鹏成,任宏,郭峰.信息不对称理论及其在工程项目管理中的应用[J].重庆建筑大学学报,2006,28(1):119-122. 被引量:37
  • 3Barnes M.A long terra view of project management-its past and its likely future[C]. Berlin: 16th World Congress O, I Project Management, 2002.
  • 4ClelandD.I.,IrelandL.R.项目经理便携手册[M].欧立雄,等,译.北京:机械工业出版社,2002.
  • 5Thevendran V.,Mawdesley M.J. Perception of human risk factors in construction projects: an exploratory study [J]. International Journal of Project Management, 2004,22 (2): 131-137.
  • 6Au M.C.Y.,Chan E. H.W. Attitudes of contractors and employers towards transfer of a time-related risk in construction contracts [C]. Construction Research Congress 2005: Broadening Perspectives - Proceedings of the Congress, 2005 : 691-703.
  • 7Chan E. H.W.,Au M.C.Y. Building contractors behavioural pattern in pricing weather risks[J].International Journal of Project Management, 2007,25 (6) :615-626.
  • 8Adams F. G. ,et al.Information asymmetry and competitive bidding in auditing[J].Economic Inquiry, 2005,43 (2) :417- 425.
  • 9Verma A., Terpenny J. Dynamic project management: a principal-agent based approach [C]. Atlanta: IIE Annual Conference and Exposition 2005.
  • 10Muller R. ,Turner J.R. The impact of principal-agent relationship and contract type on communication between project owner and manager [J] .International Journal of Project Management, 2005,23 (5): 398-403.

共引文献46

同被引文献32

引证文献8

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部