期刊文献+

采用“双机三点吊”吊装钢筋混凝土长柱的最优方案的研究 被引量:2

Study on the Optimum Scheme of “Double Crane and Threehoisting Point”for the Whole Erection of the Large scale Slender R.C.Column
下载PDF
导出
摘要 主要研究均载钢筋混凝土长柱“双机三点吊”约束绳系的最优绳程组合、最优绳元高度 (对应最优绳长 )、最优吊点坐标。以“弯曲应变能最小”为优化准则、采用“三步循环坐标搜索法”求解最优吊点坐标。优化结果可供工程吊装技术人员使用参考。 The restrained rope system“double crane and three hoisting point”for the whole erection of the large scale slender R.C.column is sutdied with respect to optimization of rope confignration,hoisting point and rope element height (corresponding to best rope element length).Using the criterion of “minimum bending strain energy”,the optimum hoisting points of the column are determined with the method of “three step cycling coordinate search”.Optimized resultant are references for engineers and technicians. [WT5HZ]
出处 《东北电力学院学报》 2000年第3期32-37,共6页 Journal of Northeast China Institute of Electric Power Engineering
基金 东北电力学院科研基金
关键词 钢筋混凝土长柱 双机三点吊 最优吊点 吊装 Slender R.C.column “Double crane and three hoisting point” Bending strain energy The best hoisting point
  • 相关文献

参考文献2

二级参考文献3

  • 1陈祥都,约束绳系力学,1992年
  • 2田广寿,建筑技术,1982年,1期,57页
  • 3陈国先,数学与实践,1977年,1期,58页

共引文献8

同被引文献6

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部