期刊文献+

底水气藏气水分层开采技术 被引量:2

Zoning Production Technique of Gas and Water in Gas Reservoirs with Bottom Water
下载PDF
导出
摘要 底水锥进会造成气藏产量下降,气井水淹,采收率下降。通过双层完井,采用气水分层开采方法,使气水界面上的天然气通过油套环空排出,气水界面下的水则通过油管抽出,此法可以抑制气井水锥,使气井产量不受底水锥进临界产量限制,增加气井产量,提高气藏采收率。对气井排水消锥的原理进行了分析,用数学解析式计算了消除水锥时生产井的合理气水产量比,为底水气藏开发提供理论指导。气水分层开采技术适用于对底水分布认识比较清楚,同时气水界面比较明显的底水气藏。 Bottom water coning would cause gas production decline,water flooding in gas wells and decrease of gas recovery factor.Dual completion technology and gas-water zoning production method were used to drain the gas through tubing-casing annulus,the gas below the gas-water interface was released through tubings,it can be used to restrict water coning in gas wells,thus production in the gas wells would not restricted by water coning and production was raised in the gas wells,thereby the recovery factor of the gas wells was enhanced.The principle of water drainage and coning removal in the gas wells are analyzed,a mathematical analytical equation is used to calculate rational gas-water production ratio in producing wells as water coning is removed,it provides a theoretical guidance for gas reservoirs with bottom water.The gas-water zoning production method is suitable for production in the gas reservoirs with clear understanding of bottom water distribution and obvious gas-water interface.
出处 《石油天然气学报》 CAS CSCD 2013年第5期104-107,2,共4页 Journal of Oil and Gas Technology
基金 国家科技重大专项(2011ZX05042-002-001)
关键词 底水气藏 水锥 气锥 产量比 分层开采 gas reservoir with bottom water water coning gas coning production ratio zoning production
  • 相关文献

参考文献11

  • 1(美)詹姆斯·利,亨利·尼肯斯,迈克尔·韦尔斯.气井排水采气[M],何顺利,等译.北京:石油工业出版社,2009.
  • 2Widmyer R H . Producing petroleum from underground formations [P] , US: 2855047, 1995.
  • 3Swisher M D, Wojtanowicz A K. New dual completion method eliminates hottom water coning [J] . SPE30697, 1995.
  • 4Shirman E I, Wojtanowicz A K. Water coning reversal using doveahole water sink theory and experimental study [J] . SPE38792, 1997.
  • 5Armenta M. Mechanism and control of water inflow to wells in gas reservoirs with bottom-water drive [D] . Louisiana: Louisiana State University and Agricultural & Mechanical College, 2003.
  • 6Armenta M, Wojtanowicz A K. Incremental recovery using dual-completed wells in gas reservoir with bottom water drive: a feasibility study [C].Calgary, Alberta: Canadian International Petroleum Conference, 2003-06-10-12.2003-194.
  • 7伍增贵,张辉军,张义堂.双层完井技术提高底水油藏开发效果[J].石油钻采工艺,2007,29(1):103-106. 被引量:13
  • 8杨波,唐海,吕栋梁,周科,彭得兵.底水气藏超前排水采气[J].石油天然气学报,2010,32(1):351-353. 被引量:2
  • 9李传亮.修正DUPUIT临界产量公式[J].石油勘探与开发,1993,20(4):91-95. 被引量:34
  • 10谢林峰,李相方.底水气藏水锥高度与形状计算新方法[J].天然气工业,2004,24(4):54-56. 被引量:10

二级参考文献30

共引文献53

同被引文献17

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部