5Geoffroy D N. Cost-Effective Preventive Pavement Maintenance[R]. Synthesis of Highway Practice 223, Washington, DC:National Cooperative Highway Research Program, 1996
6Walls J, Smith M R. Life Cycle Cost Analysis in Pavement Design-Interim Technical Bulletin[R]. Report FHWA-SA-98-079, Washington, DC:Federal Highway Administration, 1998
7Michigan DOT. Capital Preventive Maintenance Program-Guidelines[R], Michigan, March 1999
8Timely Preventive Maintenance for Municipal Roads-Best Practice [OL]. http://www.infraguide.gc.ca/docs/TimelyPreventiveMaintenanceforMunicipalRoads.pdf,2003.6.13
9Chatti K, Lee D. Development of a preventive maintenance strategy for minimizing roughness-related pavement damage[J], Transportation Research Record,Issue: 2001, 1769:39-45
10Lee, D; Chatti, K; Baladi, G Y. Development of Roughness Thresholds for Preventive Maintenance Action Aimed at Reducing Dynamic Loads [J], Transportation Research Record,Issue: 2002,1816:26-33