期刊文献+

湖南省不同岩性区风电场工程水土保持措施配置研究 被引量:2

Study on soil and water conservation measures configuration of wind power project in different lithology area in Hunan province
下载PDF
导出
摘要 在风电场建设过程中不可避免地会对土壤及植被造成一定的扰动和破坏,人为加剧水土流失。目前,对风电场工程的水土流失特点及防治措施体系已进行了较深入的研究,但在各个地区不同岩性条件下水土流失又有着本地区独有的特征,所采取的措施也不能千篇一律。以湖南省3个不同岩性区的风电场为例,对其水土流失特点进行分析,探讨了在不同岩性条件下风电场工程的水土保持措施配置。 In the process of building wind farms inevitably to a certain extent cause the soil and vegetation disturbance and destruction,artificial aggravate water loss and soil erosion. At present,there has a number of in - depth study on water and soil erosion characteristics and prevention and control measures system of wind power projects, But in different lithology area soil and water erosion and has unique region characteristics, so the measures cannot be follow the same pattern. This paper has taking three wind farms of different lithology area in Hunan province as an example,analysed its soil and water erosion characteristics, and discussed the soil and water conservation measures configuration of wind power project in different lithology conditions.
作者 刘碧维 宋楠
出处 《电力科技与环保》 2013年第3期52-53,共2页 Electric Power Technology and Environmental Protection
关键词 水土流失 风电项目 不同岩性 措施配置 Soil and water loss Wind power projects Different lithology Measures configuration
  • 相关文献

参考文献8

二级参考文献45

共引文献142

同被引文献11

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部