摘要
在高速公路扩宽施工中,新老路拼接处的处置是主要技术难点之一。通过分析湖北省黄(石)黄(梅)高速公路蕲春互通改建工程,提出新老路拼接处裂缝处置的建议。
The disposition of new and old road joining place is one of the main technological difficulty in expressway broadening construction. Advices on new and old road joining place crack disposition is provided by analyzing the Qichun interoperable reconstruction project of Huang ( shi ) - Huang ( mei ) Highway in Hubei province.
出处
《北方交通》
2013年第5期24-27,共4页
Northern Communications
关键词
高速公路
扩宽工程
新老路拼接
裂缝防治
Expressway
Broadening project
New and old road joining
Crack prevention and control