期刊文献+

IPD模式在中国成功实施的关键影响因素分析 被引量:9

原文传递
导出
摘要 IPD作为一种新型的项目交付模式,已经在美国、澳大利亚等发达国家得到成功的应用,并且受到诸多学者的广泛关注。然而,IPD模式在中国的发展还处于起步阶段,其成功实施受到诸多因素的影响。在文献研究的基础上,结合IPD模式下的项目特征,总结分析了中国实施IPD模式的影响因素;利用主成分分析法对这些因素进行分析,得出了IPD模式在中国成功实施的关键影响因素;根据分析结果提出了相应的建议,从而为中国成功实施IPD模式提供参考。
出处 《项目管理技术》 2013年第6期23-27,共5页 Project Management Technology
基金 国家自然科学基金委员会资助项目(71272146)
  • 相关文献

参考文献12

  • 1The Associated General Contractors of America (AGC). Integrated Project Delivery for Public and Private Owners [M]. 2010: 1-3.
  • 2M MotiarRahman, Mohan Kumaraswamy. Contracting Rela- tionship Trends and Transitions [ J]. Journal of Management in Engineering, 2004, 20 (4): 147-161.
  • 3William A, Lichtig. The Integrated Agreement for Lean Project Delivery [ J ]. Construction Lawyer ( ABA ), 2006, 26 (3): 1-8.
  • 4The American Institute of Architects. Integrated Project Delivery: a Guide [ M ]. USA: The American Institute of Architects, 2007.
  • 5Davil C K, Burcinbeceerk-Gerber. Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery [J]. Journal of Construction Engineering and Management, 2010, 136 (8): 815-825.
  • 6Mcgraw-Hill Construction. AIA California Council Integrated Project Delivery-A Working Definition [ M ]. California: Sacramenta AIA California Council, 2007.
  • 7徐韫玺,王要武,姚兵.基于BIM的建设项目IPD协同管理研究[J].土木工程学报,2011,44(12):138-143. 被引量:57
  • 8Kim Y-W, Dossick C S. What Makes the Delivery of a Project Integrated? A Case Study of Children's Hospital, bellevue, WA [ J ]. Lean Construction Journal, 2011 (1): 52-66.
  • 9The Construction Management Association of America (CMAA). Managing Integrated Project Delivery [ OL ]. 2010 (10).
  • 10Milton F. New Standard Contracts for Integrated Project Delivery: An Analysis of Structure, Risk, and Insurance by Kristin Ballobin [R]. Lunch Research Fellow, 2008.

二级参考文献20

  • 1Feniosky Pena-Mora, Michael Li. Dynamic planning and control methodology for design/build fast-track construction projects [ J ]. Journal of Construction Engineering and Management, 2001, 127 (1): 1-17.
  • 2George Elvin. Integrated practice in architecture: Mastering design-build, fast- track, and building information modeling [M]. New Jersey: John Wiley and Sons, 2007.
  • 3AIA Nation/AIA California Council. Integrated project delivery: a guide [M/OL]. Washington: The American Institute of Architects, 2007 [2010-10-30]. http: //www. betterbricks. com/ graphics/assets/documents/AIA-_ IPD_ Guide 2007. pdf.
  • 4David C Kent, Burcin Becerik-Gerber. Understanding construction industry experience and attitudes toward integrated project delivery [ J ]. Journal of Construction Engineering and Management, 2010, 136 (8): 815-825.
  • 5Gregory A Howell. What is lean construction [ C]//Iris D Tommelein, Glenn Ballard. Proceedings of the 7th annual conference of the International Group for Lean Construction. Berkeley: IGLC-7, 1999.
  • 6Patrick J OConnor. Integrated project delivery: collaboration through new contract forms [ M/OL ]. Minneapolis: Faegre & Benson LLP, 2009 [2010-10-30]. http: //www. faegre. com/webfiles/AGC- IPD% 20Paper. pdf.
  • 7Jonathan Cohen. Integrated Project Delivery: Case Studies [M/OL]. Sacramento: AIA California Council, 2010 [ 2010- 10- 30 ]. http: //www. klingstubbins, com/about/ pdfs_ articles/Jan_ 01_ 10_ AIA IPD% 20CaseStudies_ Autodesk. pdf.
  • 8Owen Matthews, Gregory A Howell. Integrated project delivery an example of relational contracting [ J ]. Lean Construction, 2005, 2 (1) : 46-61.
  • 9McGraw- Hill Construction, AIA California Council. Integrated project delivery: A Working Definition [ M]. Sacramento: AIA California Council, 2007.
  • 10Mark Konchar, Victor Sanvido. Comparison of US project delivery systems [ J ]. Journal of Construction Engineering and Management, 1998, 124 (6): 435-444.

共引文献83

同被引文献67

引证文献9

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部