期刊文献+

基于大系统理论的面板堆石坝土石方调配平衡研究 被引量:2

Study on Allocation Balance of Faced Rock-fill Dam Earth-rock Work Based on Large Scale System Theory
下载PDF
导出
摘要 以龙背湾水电站面板堆石坝土石方调配为例,针对土石方调配问题,将土石方调配系统视为一个大系统,系统分析了调配过程中工程进度、道路情况、天气情况等影响因素及开挖和填筑等各方面的相互联系与制约关系,基于大系统理论建立土石方调配模型,获得了拟定进度下合理的土石方调配方案,为龙背湾水电站工程土石方调配施工组织设计提供了可靠依据。 Taking earth-rock allocation of faced rock-fill dam of Longbei Bay hydropower station as an example,the system of earth-rock allocation is regarded as a large scale system.And then the influencing factors(project schedule,road situation and weather) in allocation of the earth-rock are systematically analyzed.At the same time,the mutually correlation and restricted relationship between excavation and filling are concerned.Finally,the theory of large scale system is used to establish the earth-rock allocation model.Reasonable earth-rock allocation scheme under the drafted schedule is obtained,which provides a reliable basis for construction organization design of Longbei Bay hydropower station earth-rock allocation.
出处 《水电能源科学》 北大核心 2013年第6期128-130,92,共4页 Water Resources and Power
关键词 大系统理论 土石方调配 建模 龙背湾水电站 theory of a large scale system earth-rock work allocation modeling Longbei Bay hydropower station
  • 相关文献

参考文献7

二级参考文献16

共引文献44

同被引文献6

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部