摘要
长清路工程系改建工程,现场既有地下管线、构筑物情况复杂。该文着重介绍了桥梁结构设计过程中,对管线的避让及其保护措施,以及对外环线分隔带内原有承台的充分利用,可供同行参考。
Changqing Road Project is a reconstruction project with the complicated situation of the existing underground pipelines and structures.The article focuses introduction on the pipeline avoidance and its protective measures in the design of bridge structure,and the fully utilization of the original base slabs within the separation strip of the Outer Ring Line,which can be referred for the similar projects.
出处
《城市道桥与防洪》
2013年第5期109-111,12,共3页
Urban Roads Bridges & Flood Control
关键词
改建工程
地下管线
保护
桥梁设计
上海市
reconstruction project,underground pipeline,protection,bridge design,Shanghai