期刊文献+

武汉市荣军泵站改扩建设计探讨 被引量:2

Discussion on Reconstruction and Expansion Design of Rongjun Sewage Pumping Station in Wuhan City
原文传递
导出
摘要 通过对武汉市荣军泵站全面调查、分析,进行了项目改造方案的论证,总结了老排污泵站改造设计的要点,包括泵机间结构改造、机电设备及控制系统改造、配电系统改造、除臭设备安装等,对类似城市的老排污泵站改扩建有一定借鉴作用。 Based on the full investigation and analysis of the current status of Rongjun sewage pumping station in Wuhan City, the project reconstruction scheme was demonstrated. The design essentials in the reconstruction of old sewage pumping station, including reconstruction of pump room structure, reconstruction of mechanical and electrical equipment and control system, reconstruction of power distribution system and installation of deodorization system were summed to provide the design reference for other similar reconstruction projects.
出处 《中国给水排水》 CAS CSCD 北大核心 2013年第12期59-61,共3页 China Water & Wastewater
关键词 排污泵站 改扩建 潜水泵站 sewage pmnping station reconstruction and expansion submersible pumping station
  • 相关文献

参考文献1

同被引文献7

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部