核电厂长燃料循环项目中仪表漂移计算方法的研究 被引量:3

Instrument drift calculation in the nuclear power plant's refueling cycle extension project
下载PDF
导出
摘要 开展长燃料循环项目是提高核电厂运行经济性的有效途径之一,而仪表漂移计算分析是该项目论证中的重点和难点。本文结合秦山第二核电厂开展长燃料循环周期改造的实际经验,对仪表漂移计算的方法进行了探讨,采用经验反馈法对仪表及通道进行了数据收集、筛选、分类,最终有效完成了计算分析,有力地论证了换料周期从12个月延长到18个月后仪表控制系统运行的稳定性和可靠性。 Refueling cycle extension project is one of the effective ways to improve economy of the nuclear power plant,and instrument drift calculation is the emphasis and difficulty in the demonstration project.This paper combines the experience of the nuclear power plant to carry out refueling cycle extension,and discusses the methods of instrument drift calculation. Then by using the experience feedback method,the data of instruments and channels are collected,filtrated,classified. Finally the effective completion of the calculation effectively proves the running stability and reliability of the instrument control system after refueling period extended from 12 months to 18 months.
出处 《仪器仪表用户》 2013年第3期18-20,共3页 Instrumentation
关键词 仪表 漂移 延长 长燃料循环 instrument drift extension refueling cycle
  • 相关文献

参考文献6

  • 1NRC Generic Letter 91-04:Changes in Technical Specification Surveillance Intervals To Accommodate A 24-month Fuel cycle[M].1991.
  • 2Guidelines for Instrument Calibration Extension/Reduction-Revision 1 :Statistical Analysis of Instrument Calibration Data[M].EPRI,PALO Alto,CA:1998.TR-103335-R1.
  • 3核电秦山联营有限公司.秦山第二核电厂仪表校验通道手册[M].2008.
  • 4核工业第二研究设计院.秦山第二核电厂仪表通道精度计算手册[M].2002.
  • 5核电秦山联营有限公司.秦山第二核电厂一/二号机组安全相关系统定期试验要求(D版)[M].2009.
  • 6Rosemount Nuclear Instruments Inc.Rosemount transmitter installado n,,commissioning,operation maintenance manual[M].2007.

同被引文献5

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部