下坂地水利工程沥青混凝土心墙坝工作性态分析 被引量:6

Working Status Analysis on Asphalt Concrete Core Dam in Water Conservancy Engineering
下载PDF
导出
摘要 以新疆下坂地水利枢纽工程中沥青混凝土心墙坝的设计、施工及监测成果为例,对施工期沥青混凝土心墙变形和温度安全监测资料进行了分析,并对下游坝体内部变形的安全监测资料也进行了较详细的分析探讨.结果表明下坂地水利枢纽工程沥青混凝土心墙砂砾石堆石坝的工程质量及结构的稳定安全可靠.此结果可为相关工程提供借鉴. The deformation of asphalt concrete core wall under construction and the data of temperature safety monitoring are analyzed, taking the design, construction and monitoring of asphalt concrete core dam in Xiabandi water conservancy hub project, Xijiang, for example. The dam safety monitoring data of internal deformation in downstream is also analyzed in detail. Results show that the construction quality and the structure safety of the sandy gravel asphalt concrete core wall in Xiabandi water conservancy hub project is stable and reliable, which can provide reference for related projects.
作者 戴灿伟
出处 《浙江水利水电专科学校学报》 2013年第2期1-5,共5页 Journal of Zhejiang Water Conservancy and Hydropower College
关键词 下坂地水利工程 沥青混凝土心墙 安全监测 温度 变形 Xiabandi water conservancy engineering asphalt concrete core wall safety monitoring temperature deformation
  • 相关文献

参考文献2

共引文献10

同被引文献19

引证文献6

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部