期刊文献+

370m跨径X形提篮拱结构有限元模拟研究

Research on structural FEM of 370 m large span x-type arch bridge
下载PDF
导出
摘要 渝黔铁路是国家"八纵八横铁路网"中"包柳铁路大通道"的重要组成部分。以渝黔铁路线中X形提篮拱桥为依托工程,为确保施工工程质量与安全,采用Midas/Civil2010有限元软件对该拱桥成桥后主拱圈应力、运营阶段稳定性与位移验算等进行了计算和分析,结果表明该提篮拱桥拱脚处最大压应力为14 MPa满足混凝土规范要求设计值,结构运营阶段稳定系数为32.2,满足现行规范限值,结构在横纵向自振周期分别为1.473 s与1.389 s均满足规范限值。 Yu-Qian Railroad is an important part of Baotou-Liuzhou Railway in the railway main lines. In order to ensure the quality and safety of the x-type arch bridge which is going to be built in Yu-Qian Railroad. The calculation and analysis are made of the stress of the main arch ring, the stability of the operation phase and the displacement by Midas/Civil2010 FEM software. The results indicate that the maximum stress of arch springing is 14 Mpa which can meet code requirements. K is 32.2 which can meet the present code in the operational stage. The natural vibration period of transverse and longitudinal directions are 1. 473 s and 1. 389 s which can meet code requirements.
出处 《山东建筑大学学报》 2013年第2期129-133,共5页 Journal of Shandong Jianzhu University
关键词 X形提篮拱桥 运营阶段 位移验算 仿真分析 x-type arch bridge operation phase checking the displacement calculation simulation analysis
  • 相关文献

参考文献8

  • 1曹正洲,冯玉涛,沈逢俊.大跨径钢箱提篮拱桥空间稳定性分析[J].桥梁建设,2011,41(1):43-47. 被引量:30
  • 2黄奶清,时娜.横撑布置形式对提篮拱稳定影响[J].安徽建筑工业学院学报(自然科学版),2011,19(5):5-8. 被引量:7
  • 3CECS28:90钢管混凝土结构设计与施工规程[s].北京:中国计划出版社,1990.
  • 4DL/T5085-1999钢-混凝土组合结构设计规程[S].北京:中国电力出版社,1999.
  • 5TB10002.3-2005,铁路桥涵钢筋混凝土和预应力混凝土结构设计规范[S].北京:中华人民共和国铁道部,2005.
  • 6TB1002.1-2005铁路桥涵设计基本规范[s].北京:中华人民共和国铁道部,2005.
  • 7铁建设函[2005]285号新建时速200公里客货共线铁路设计暂行规定[S].2005.
  • 8JTGGD60-2004,公路桥梁通用设计规范[s].北京:中华人民共和国交通部,2004.

二级参考文献8

共引文献49

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部