±660kV银川东换流变电站外冷24V信号电源隐患分析 被引量:1

Analysis of Hidden Troubles on the 24 V Signal Power of the Valve Cooling System in Yinchuandong ±660 kV Converter Station
下载PDF
导出
摘要 阀冷却系统作为换流站内核心设备,其安全稳定运行直接关系到直流系统的运行状况。以2011年8月30日胶东换流站阀外冷24 V信号电源丢失导致直流闭锁为例,深入分析银川东换流站外冷系统直流电源配置、电源切换逻辑等,发现隐患并提出改造方案,最后通过现场试验论证,杜绝此类隐患再次发生。 As the core equipment in the converter station, the valve cooling system's safe and stable operation is directly related to the operation status of the HVDC system. With the loss of the 24 V signal power of the valve cooling system in Jiaodong Converter Station leading to the HVDC block which happened on August 30, 2011 as a ease for analysis, this paper presents an in-depth analysis of the DC power supply configuration, power switching logic of the valve cooling system of Yinehuandong Converter Station in a bid to to find hidden troubles and put forward the retrofit scheme. The field tests conducted suggests that the scheme can prevent this kind of hidden problems from occurring again.
作者 张斌 韦鹏
出处 《电网与清洁能源》 2013年第4期46-49,55,共5页 Power System and Clean Energy
关键词 阀冷却系统 银川东换流变电站 直流闭锁 信号电源 valve cooling system Yinchuandong ConverterStation HVDC block signal power
  • 相关文献

参考文献9

  • 1赵婉君.高压直流输电工程技术[M].北京:中国电力出版社,2004.
  • 2习超群,李辉,吴宁,等.银川东换流变电站运行规程.银川:国网运行分公司银川管理处,2010:63-67.
  • 3王兆安 黄俊.电力电子技术[M].北京:机械工业出版社,2004..
  • 4戴熙杰.血流输电基础[M].北京:水利水电出版社,1990:30-32.
  • 5国家电网公司运维检修部.直流换流站历年事故汇编『R].北京,2011:1-2.
  • 6国家电网公司运维检修部.直流换流站运维技能培训教材阀冷却系统[M].北京:中国电力出版社,2012:115-116.
  • 7胡锦根.刘东,代海涛,等.2011年08月30日胶东换流变电站伐外冷系统故障引起极闭锁分析报告I.青岛:国网运行分公司青岛管理处,2011:1-2.
  • 8韦鹏.针对2011年08月30日胶东换流变电站直流闭锁银川尔换流站采取的反措[R].银川:国网运行分公司银川管理处,2011:1-2.
  • 9张斌.银川东换流站外风冷信号改造及实验厅案[R].银川:国网运行分公司银川管理处,2011:2-3.

共引文献232

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部