摘要
对于火力发电机组 ,机组启动调试是电力建设施工的最后一道工序 ,其质量的优、劣是直接关系到机组的安全、顺利投产以及充分发挥生产效益的一个关键。而桥电六期 3#锅炉调试是我专业目前所从事的最大一台机组的调试 ,因此 ,认真总结调试经验就显得非常重要。文章讲述了我专业对桥电 3#锅炉启动调试前的检查、试验和准备工作以及调试项目、程序和最后的结论。
WT5”,6BZ]To thermal power set,starting set debugging is a last working procedure to building of electric power.Whether it's quality good or not a crux and it will effect set's safety,successfully goes into operation,and fully brings into play productive benefit,3\+# boiler debugging in the sixth Phase of QiaoTou is a biggest set debugging that our specialty engaged in,so it is very important to summarize debugging work hardly.The paper tells reader that our specialty did the work is checked,experimented,prepared and debugged the item and program before debugging to 3\+# boiler in the sixth Phase of QiaoTou.