摘要
先张法预应力空心板梁是桥梁建设中的重要结构,其质量控制显得尤为重要。目前在农桥建设上,认为先张法预应力空心板梁的质量由生产企业负责,施工现场只重视要求有合格证明材料,却忽略了对生产企业及生产过程的质量控制。为改变这种状况,对先张法预应力空心板梁加工定做应进行全面质量控制。
Pretensioned prestressed concrete hollow slab beam is an important structure in bridge construction, and its quality control is even more important.In current farm bridge construction,the production enterprises are responsible for the quality of pretensioned prestressed hollow slab beam.While as long as qualified certification materials provided,the production enterprises and production process might be ignored. In order to change this situation, complete quality control of its processing should be carried out.
出处
《江苏水利》
2013年第5期32-33,共2页
Jiangsu Water Resources
关键词
先张法预应力空心板梁
质量控制
桥梁建设
pretensioned prestressed hollow slab beam
quality control
bridge construction