摘要
通过合理灵活拆分三维模型工作包并关联进度计划,采用进度模拟实现项目进度精确控制,施工工序模拟验证施工方案可行性,为项目管理提供了更多的可视化管理辅助,进一步提高了BIM(建筑信息模型)技术在所承接项目的应用水平,实现了一些技术上的突破,为BIM应用于工程建设全生命周期服务奠定了基础。
Reasonable and agile splitting 3D model tool bag and link the plan,carry out exact control for the project plan by plan simulation,validate the feasibility of construction plan by construction procedure simulation,provided more visual assistant management for the project management.Improve application level of project contract by BIM technology,have some engineering e technical innovation,establish the basis for BIM technology application in whole life cycle of the engineering.
出处
《工程质量》
2013年第6期20-24,共5页
Construction Quality