摘要
Considering the actual operating experience of the Daode Wind Farm, this paper analyzes the reasons for the fault of the 10-kV switch cabinet. Some technical improvements and management measures, such as implementing the anti-accident technical measures, improving the installation and debugging level, and strengthening operation inspection, are proposed.
Considering the actual operating experience of the Daode Wind Farm, this paper analyzes the rea-sons for the fault of the lO-kV switch cabinet. Some technical improvements and management measures, such as implementing the anti-accident technical measures, improving the installation and debugging level, and strengthening operation inspection, are proposed.