摘要
合理确定煤运通道铁路平江至新余段线路方案,在实现煤炭运输需求的前提下最大层次填补所处区域路网空白,并兼顾沿线国土开发功能,是需要仔细研究的问题。通过对平江至新余段线路走向4大系列方案的研究,得出了推荐采用经铜鼓(万载)方案,同时对经浏阳(溪江)方案作同精度比较的结论。
Under the premise of meeting the coal transportation demand and taking into account the function of the national land development along the line, how to reasonably design the line scheme of Pingjiang-Xinyu coal transportation railway is a problem needing to be carefully studied which can fill the blank in the regional road network with the maximum level. In this paper, through comparison research on four series of schemes, the line scheme through Tonggu or Wanzai is recommended. Meanwhile the line scheme through Liuyang or Xiiiang was compared in detail.
出处
《交通科技》
2013年第3期126-128,170,共4页
Transportation Science & Technology
关键词
煤运通道
平江至新余段
线路研究
coal transportation railway
Pingjiang to Xinyu section
route research