摘要 针对潮流能资源较丰富的成山头外海域,利用FVCOM数值模式,在良好模拟该海域潮流场的基础上,运用能量耗散原理,对该海域的潮流能资源可开发量进行了评估。结果表明,在转换装置的拖拽系数为0.07时,面积为27km2的成山头近岸海域的可开发潮流能资源约为17.9MW,其中大潮期间的可开发量高达37.7MW,而小潮期间则为7.3MW。在此条件下,该海域大潮期间涨急和落急时刻的流速分别减小了40%和38%,但发电装置对潮汐的影响较小,在成山头顶端的高潮潮位仅下降了4cm。 In this study, the extractable energy resource of the tidal current is estimated using the FVCOM model in the open sea area of the Chengshantou Cape in the area of 27km^2, which is known as an area of good potential in the exploita-bility of tidal current energy. Based on the energy dissipation principle, simulation of the tidal current in this area was performed to estimate the available energy quantity. Our results show that when the drag coefficient of turbines is 0.07, the available energy of the tidal current for the area is 17.9MW, and during the periods of spring tide and neap tide, the esti-mated energy quantity is 37.7MW and 7.3MW, respectively. The maximum decrease in the current velocity in the flood period and ebb period is 40% and 38%, respectively. However, the tidal level is slightly affected by turbines, which de-creases by 4cm only in the spring tide period at the tip of the Chengshantou Cape.
出处 《海洋与湖沼》 CAS CSCD 北大核心 2013年第3期570-576,共7页 Oceanologia Et Limnologia Sinica
基金 中国科学院海洋环流与波动重点实验室开放基金课题"潮流能资源评估方法研究" KLOCAW1105号 海洋能资金专项"潮汐能和潮流能重点开发利用区资源勘查与选划" GHME2010ZC11号 海洋能资金专项"海洋能资源勘查与选划成果整合与集成" GHME2012ZC05号 国家海洋局青年基金"波浪能电站建设可行性分析中资源条件评估方法研究"
关键词 成山头 潮流能 可开发量评估 Chengshantou Cape Tidal current energy Assessment of exploitable energy
  • 相关文献

参考文献21

二级参考文献110

共引文献134

同被引文献82

  • 1张亮,汪鲁兵,李凤来,张桂湘.竖轴变攻角潮流发电水轮机性能预报流管模型研究[J].哈尔滨工程大学学报,2004,25(3):261-266. 被引量:14
  • 2王传崑,卢苇.海洋能资源分析方法及储量评估[M].北京:海洋出版社,2009.
  • 3郑志南.海洋潮流能的估算公式.哈尔滨船舶工程学院学报,1987,8(2):37-44.
  • 4张亮,孙科,罗庆杰.潮流水轮机导流罩的水动力设计[J].哈尔滨工程大学学报,2007,28(7):734-737. 被引量:25
  • 5丁平兴,贺松林,张国安,孔亚珍,劳治声.湛江湾沿岸工程冲淤影响的预测分析Ⅱ.冲淤的数模计算[J].海洋学报,1997,19(1):64-72. 被引量:19
  • 6WANG T Q,YUAN P. Technological economic study forocean energy development in China [C]. The IEEEInternational Conference on Industrial Engineering andEngineering Management,Singapore, 2011 :610 -614.
  • 7BFKIGAARD P, KOFOED J P, RASMUSSEN M R. Overtoppingmeasurements on the Wave Dragon Nissum Bredningprototype [C]. 14thAnnual Int. Offshore and PolarEngineering Conf. , ISOPE, Toulon , France, 2004.
  • 8HANSTHOLM. Danish Wave Energy Center [EB/OL].http://www. danweo. com,2013 - 10 -04.
  • 9Marine Institute. Galway Bay Wave Energy Test Site [EB/OL]. http ://www. marine, ie/home/aboutus/organisa-tiostaff/researchfacilities/Ocean + Energy + Test + Site, htm,2013 -10 -04.
  • 10Seai. Belmullel Wave Energy Test Site[EB/OL]. http://www. seai. ie/Renewables/Ocean_Energy/AMETS/Belmullet-Test-Site/,2013 -10 -04.

引证文献10

二级引证文献64

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部