某矿为安全开采煤炭资源,采用经验公式预计和计算机数值模拟方法,按规划设计开采煤层厚度分别研究了单独开采16#煤、17#煤后覆岩导水裂隙带高度,采用经验公式计算为36.1m和29.7 m;采用计算机模拟方法计算为37.1 m、26.9m。研究了按规划设计开采煤层厚度将16#煤、17#煤全采后覆岩导水裂隙带高度为41.7 m。
QIU Sheng- hua ,YANG Zhi- xi, LIU Guang- zhao, CAO Fu- hui, LIU Meng ,ZHU Yan- jiang (1. School of Urban Construction and Safety Engineering ,Shanghai Institute of Technology,Shanghai 201418, China; 2. Zhaizhen Coal Mine, Xinwen Mining Group Company, Xintai 271204, China;3. Shandong Fengyuan Yuanhang Coal Company, Tengzhou 277518, China) QIU Sheng- hua ,YANG Zhi- xi, LIU Guang- zhao, CAO Fu- hui, LIU Meng ,ZHU Yan- jiang (1. School of Urban Construction and Safety Engineering ,Shanghai Institute of Technology,Shanghai 201418, Chi For the safe mining of coal resource, depending on the designing mining height, a mine applied the two methods of empirical formula and numerical simulation to study the height of water flowing fractured zone of 16" and 17" coal seams which are exploited a- lone. The result shows that these two values are 36.1 m and 29.7 m according to the empirical formula, and 37.1 m and 26.9 m according to computer simulation. Depending on the designing mining height, the height of water flowing fractured zone of 16^# and 17^# coal seams after mining is 41.7 m according to computer simulation.
出处
《煤矿安全》
CAS
北大核心
2013年第6期34-36,共3页
Safety in Coal Mines
基金
上海市教委重点学科资助项目(J51502)
上海市教委资助项目(405zk090115001)
关键词
导水裂隙带高度
计算机模拟
覆岩破坏
“三带”高度
the height of water flowing fractured zone
computer simulation
overburden rock failure
" three zones" height