摘要
采用ANSYS软件对焦家金矿望儿山分矿的Ⅱ级岩体进行不同进路参数下的采场稳定性分析,进路宽度增大时,一步进路充填体内的应变能也越来越大,当一、二步进路宽度为5 m时,充填体本身不能承受太大的应力而破坏,由此得出:望儿山分矿Ⅱ级岩体进路最佳尺寸为4 m×4.5 m(高×宽)。
Slope stability analysis of different approach parameters was done on II grade rock mass of Wangershan branch mine of Jiaojia gold mine by ANSYS. The strain energy of filling body of step ap- proach increases with width of approach increasing. When width of one and two step approach was 5 m, filling body damaged due to could not bear too much stress. It indicates that approach best measurements of II grade rock mass of Wangershan branch mine are 4 m × 4.5 m (height x width).
出处
《现代矿业》
CAS
2013年第6期13-14,共2页
Modern Mining
关键词
不稳固岩体
进路法
开采参数
Unstable rock mass, Approach mining method, Mining Parameters