摘要
通过探讨混凝土低温季节施工中原材料控制、浇注过程控制、混凝土表面保护及质量监控等控制措施,为水工混凝土低温季节施工提供参考。
From the analysis on the control measures of the raw materials control, pouring process control, concrete exterior protection and quality supervision of the concrete construction in the low temperature, the essay aims to provide some references for the water conservancy project's concrete construction in the low temperature.
出处
《水科学与工程技术》
2013年第3期82-84,共3页
Water Sciences and Engineering Technology
关键词
混凝土
低温季节施工
控制措施
concrete
construction in the low temperature
control measures