摘要
文章主要叙述柬埔寨斯登沃代一级水电站大坝复合土工膜心墙的施工,解决复合土工膜与混凝土刺墙坝的结合难题。电站下闸蓄水后,下游未出现渗水,复合土工膜防渗效果良好,达到了预期防渗的目的。
This paper makes an introduction to construction of dam composite geomembrane core wall of upper Stung Atay hydropower station in Cambodia, and it gives a solution on combining composite geomembrane with concrete lateral key wall dam. Besides, there is no seepage composite geomembrane works very well and gets found at the downstream after impoundment. It is indicated that the good anti-seepage purpose.
出处
《红水河》
2013年第3期13-16,共4页
Hongshui River
关键词
接头复合土工膜心墙堆石坝
粘接
施工
斯登沃代水电站
rockfill dam with joint composite geomembrane core wall
bonding
construction
Stung Atay hy- dropower station