摘要
针对杨泗水电站丰水期母线电压过高导致出力受限的问题,在有限的场地情况下,采用加装自耦变压器及自动调压开关等综合控制措施,有效解决了杨泗水电站因电压高出力受限的问题,为处理类似问题提供了新的方法。
For Yangsi power plant output restricted by high voltage, under the condition of limited space, by adding autotransformer and automatic voltage regulating switch comprehensive control measures, Yangsi power plant high voltage power constrained problem is solved. The approach provides a new method for dealing with similar problems of power plant.
出处
《电网与清洁能源》
2013年第6期88-91,共4页
Power System and Clean Energy
关键词
水电站
高压
自耦变压器
hydropower plant
high voltage
autotransformer