仙居抽水蓄能电站上下库连接公路施工布置规划 被引量:1

Construction Layout Planning for the Road Connecting Top and Down Reservoir in Xianju Hydroelectric Power Station
下载PDF
导出
摘要 山区公路工程原始地形一般均较为陡峭,地质情况复杂。高边坡开挖及高挡墙施工难度大,多个项目平行施工、交叉作业,相互制约性强,且安全隐患高。施工中的布置规划及总体安排部署极其重要,施工布置规划的合理性决定了施工进度的快慢、成本的有效控制。为了有效控制施工现场的进度、质量、安全、投资,在施工前期必须做好施工的统筹规划布置,施工过程中,对各部位的规划布置结合施工进展情况及时实施动态调整。主要针对仙居抽水蓄能电站上下库连接公路工程的施工布置及规划进行了介绍。 The mountain road often locates in steep terrain and complex geological condition.High slope excavation and retaining wall construction is very difficult,and parallel construction and cross-operation of multiple projects result in mutual restraint and high security risks.Layout planning during construction is extremely important.Reasonable construction layout planning determines the speed of the construction schedule and effective control cost.In order to effectively control the construction progress,construction quality,construction safety and investment,in pre-construction the overall planning for the construction must be done.In construction,the planning layout must be dynamic adjusted combined with the construction progress.In this paper,the authors mainly show some views on the construction layout and planning in the construction of the road connecting top and down reservoir in Xianju Hydroelectric Power Station.
出处 《施工技术》 CAS 北大核心 2013年第12期21-23,共3页 Construction Technology
关键词 水电站 公路施工 布置 规划 hydroelectric power stations road construction layout planning
  • 相关文献

参考文献5

二级参考文献5

共引文献124

同被引文献8

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部